Features
GPS-guided autonomous flight, independent camera control via a hemispherical camera gimbal, FPV capability, 2 foot wingspan. Constructed from foamboard & PLA.
Current Status
Design phase, looking to analyze aerodynamics of preliminary model to make adjustments as required for initial construction.
View Image
Failure Analysis Paper
A technical investigation into the Apollo 1 cabin fire, examining root causes and safety impact.
Open Full DocumentAircraft Performance Analysis
Detailed evaluation of aerodynamic efficiency, flight envelopes, and structural data.
Open Full DocumentCSWA SolidWorks
Certified SolidWorks Associate in Mechanical Design. Expert in complex part modeling and assembly analysis.
VIEW CERTIFICATEPrivate Pilot
Licensed Private Pilot (PPL). Proficient in VFR navigation, cross-country planning, and cockpit resource management.
Commercial Drone Pilot
FAA Part 107 certified remote pilot for commercial small Unmanned Aircraft Systems (sUAS) operations.
First Aid / AED / CPR
Certified in emergency medical response and life-saving AED/CPR procedures.
Material Install Log
Created document to manage & update procurement status for tools & materials. This eliminated sitewide production delays amongst all crews.
Download SpreadsheetQuality Control Inspections
Conducted field inspections on structural assemblies to ensure strict compliance with engineering drawings and efficiently catch errors prior to installation. Image 1 shows a rebar rod within 2" of wooden formwork, failing my inspection for concrete placement.
View Beam Rebar View Valley Curb
Material Testing & Installation
Verified material quality through standardized testing, confirming specifications were met prior to installation.
View Cylinder Test View Crew Oversight
Stair Nosings & Rebar Submittals
Reviewed technical submittal data for stair nosing components and cross-referenced design drawings & specifications to verify material is correct and sufficient for installation.
View Nosing Submittal View Rebar Shop Docs
Transformer Takeoff
Calculated detailed takeoffs for transformer pad installation. Accurately estimated material requirements to ensure proper rebar fabrication.
Open Full Document